Difference between revisions of "Guide to Construction"
AllyBearsley (talk | contribs) |
AllyBearsley (talk | contribs) |
||
Line 99: | Line 99: | ||
| | | | ||
* Stand in the desired spot | * Stand in the desired spot | ||
* Click the [[File:Metal.png|20px]] Metal and choose ''Girder'' | * Click the [[File:Metal.png|20px]] Metal and choose ''Wall Girder'' | ||
* Use 2 sheets of [[File:Metal.png|20px]] Metal on the resulting girder | * Use 2 sheets of [[File:Metal.png|20px]] Metal on the resulting wall girder | ||
Repair: | Repair: | ||
Line 106: | Line 106: | ||
| | | | ||
* Use a [[File:welder.gif|20px]] Welder to remove the wall's plating | * Use a [[File:welder.gif|20px]] Welder to remove the wall's plating | ||
* Use a [[File:Wrench.png|20px]] Wrench to disassemble the girder | * Use a [[File:Wrench.png|20px]] Wrench to disassemble the wall girder | ||
'''Or''' | '''Or''' | ||
* Use a [[File:Crowbar.png|20px]] Crowbar to displace the girder | * Use a [[File:Crowbar.png|20px]] Crowbar to displace the wall girder | ||
|- | |- | ||
!Reinforced Wall | !Reinforced Wall | ||
Line 118: | Line 118: | ||
| | | | ||
* Stand in the desired spot | * Stand in the desired spot | ||
* Click the [[File:Metal.png|20px]] Metal and choose ''Girder'' | * Click the [[File:Metal.png|20px]] Metal and choose ''Wall Girder'' | ||
* Use a [[File:Screwdriver_tool.png|20px]] Screwdriver to form support struts | * Use a [[File:Screwdriver_tool.png|20px]] Screwdriver to form support struts | ||
* Use 2 [[File:Plasteel.png|20px]] Plasteel sheets on the reinforced girder to add reinforced plating | * Use 2 [[File:Plasteel.png|20px]] Plasteel sheets on the reinforced wall girder to add reinforced plating | ||
* Use 2 [[File:Plasteel.png|20px]] Plasteel sheets on the reinforced wall to add an external cover and finish the wall | * Use 2 [[File:Plasteel.png|20px]] Plasteel sheets on the reinforced wall to add an external cover and finish the wall | ||
Line 134: | Line 134: | ||
* Use a [[File:Screwdriver_tool.png|20px]] Screwdriver to unsecure the internal support struts | * Use a [[File:Screwdriver_tool.png|20px]] Screwdriver to unsecure the internal support struts | ||
* Use [[File:Wirecutters.png|20px]] Wirecutters to remove the internal support struts | * Use [[File:Wirecutters.png|20px]] Wirecutters to remove the internal support struts | ||
* Use a [[File:Wrench.png|20px]] Wrench to disassemble the girder | * Use a [[File:Wrench.png|20px]] Wrench to disassemble the wall girder | ||
|- | |- | ||
!Grille | !Grille | ||
Line 164: | Line 164: | ||
| | | | ||
* Stand in the desired spot | * Stand in the desired spot | ||
* Click the [[File:Metal.png|20px]] Metal and choose ''Girder'' | * Click the [[File:Metal.png|20px]] Metal and choose ''Wall Girder'' | ||
* Use a [[File:Crowbar.png|20px]] Crowbar on the girder to dislodge it | * Use a [[File:Crowbar.png|20px]] Crowbar on the wall girder to dislodge it | ||
* Use 2 sheets of [[File:Metal.png|20px]] Metal on the girders | * Use 2 sheets of [[File:Metal.png|20px]] Metal on the wall girders | ||
| | | | ||
* Use a [[File:welder.gif|20px]] Welder to remove the wall's plating | * Use a [[File:welder.gif|20px]] Welder to remove the wall's plating | ||
* Use a [[File:Wrench.png|20px]] Wrench to disassemble the girder | * Use a [[File:Wrench.png|20px]] Wrench to disassemble the wall girder | ||
|- | |- | ||
!Reinforced False Wall | !Reinforced False Wall | ||
Line 180: | Line 179: | ||
| | | | ||
* Stand in the desired spot | * Stand in the desired spot | ||
* Click the [[File:Metal.png|20px]] Metal and choose ''Girder'' | * Click the [[File:Metal.png|20px]] Metal and choose ''Wall Girder'' | ||
* Use a [[File:Screwdriver_tool.png|20px]] Screwdriver to set the internal support struts | * Use a [[File:Screwdriver_tool.png|20px]] Screwdriver to set the internal support struts | ||
* Use a [[File:Wrench.png|20px]] Wrench to displace the reinforced girder | * Use a [[File:Wrench.png|20px]] Wrench to displace the reinforced wall girder | ||
* Use 2 sheets [[File:Plasteel.png|20px]] Plasteel sheet on the displaced reinforced girder to add reinforced plating | * Use 2 sheets [[File:Plasteel.png|20px]] Plasteel sheet on the displaced reinforced wall girder to add reinforced plating | ||
* Use 2 sheets [[File:Plasteel.png|20px]] Plasteel sheet on the reinforced wall to add an external cover and finish the hidden reinforced wall | * Use 2 sheets [[File:Plasteel.png|20px]] Plasteel sheet on the reinforced wall to add an external cover and finish the hidden reinforced wall | ||
| | | | ||
* Use [[File:Wirecutters.png|20px]] Wirecutters to remove the outer grille | * Use [[File:Wirecutters.png|20px]] Wirecutters to remove the outer grille | ||
* Use a [[File:Screwdriver_tool.png|20px]] Screwdriver to expose the external reinforced cover | * Use a [[File:Screwdriver_tool.png|20px]] Screwdriver to expose the external reinforced cover | ||
Line 196: | Line 194: | ||
* Use a [[File:Screwdriver_tool.png|20px]] Screwdriver to unsecure the internal support struts | * Use a [[File:Screwdriver_tool.png|20px]] Screwdriver to unsecure the internal support struts | ||
* Use [[File:Wirecutters.png|20px]] Wirecutters to remove the internal support struts | * Use [[File:Wirecutters.png|20px]] Wirecutters to remove the internal support struts | ||
* Use a [[File:Wrench.png|20px]] Wrench to disassemble the girder | * Use a [[File:Wrench.png|20px]] Wrench to disassemble the wall girder | ||
|} | |} | ||
Revision as of 23:42, 16 August 2017
This section or article is a Work in Progress.
Assigned to: None
Please discuss changes with assigned users. If no one is assigned, or if the user is inactive, feel free to complain on the forums or try summoning another staff member.
Base Materials
Name | Picture | Requirement | Construction | Destruction |
---|---|---|---|---|
Rods | Metal | Click the Metal and choose Metal Rods | Use a File:Welder.gif Welder on Rods to turn them back into Metal | |
Floor tiles | Metal | Click the Metal and choose Floor Tiles | Use a File:Welder.gif Welder on Floor tiles to turn them back into Metal | |
Reinforced Glass | Rods + Glass | Use Rods on Glass | N/A | |
Plasteel (Reinforced Metal) | Phoron + Metal | Produced at Mining via the Smelter there. | N/A |
Flooring and Support
Name | Picture | Requirement | Construction | Destruction |
---|---|---|---|---|
Lattice | Rods | Use Rods on space tiles. | Use a File:Welder.gif Welder to turn the Lattice back into Rods. | |
Plating | Floor tiles | Use Floor tiles on a Lattice. | Use a RCD to remove the plating. | |
Steel Floor | Floor tiles | Use Floor tiles on a floor. | NONE | |
Wood Floor | Wood tiles | Use on a floor. | NONE | |
Light Floor | Glass + Metal + File:Cable-coil.png Cable coil | NONE. Can be printed from autolathe | NONE | |
Reinforced Floor | Rods | Use Rods on a floor. | NONE |
Walls and Structures
Name | Picture | Requirement | Construction | Destruction |
---|---|---|---|---|
Wall | Metal |
Repair:
|
Or | |
Reinforced Wall |
|
Note: reinforcing a wall can be done with any type of sheet, but Plasteel yields best results. |
| |
Grille | Rods |
Or
|
False Walls
Name | Picture | Requirement | Construction | Destruction |
---|---|---|---|---|
False Wall |
| |||
Reinforced False Wall |
|
|
|
Windows
Name | Picture | Requirement | Construction | Destruction |
---|---|---|---|---|
One Direction |
Or |
Or
| ||
Full |
Or
|
Reinforced Windows
Name | Picture | Requirement | Construction | Destruction |
---|---|---|---|---|
One Direction |
Or |
Or
| ||
Full |
Or
| |||
Windoor |
|
|
Or
|
Furniture
Name | Picture | Requirement | Construction | Destruction |
---|---|---|---|---|
Chairs and Stools | ||||
Table | ||||
Reinforced Table |
|
| ||
Glass Table |
| |||
Bookcase |
Machinery and Electronics
Name | Picture | Requirement | Construction | Destruction |
---|---|---|---|---|
APC | px |
|
New APCs start locked with the cover engaged and the main breaker turned off APCs may only be placed in areas which have been defined as a Station Area using the Chief Engineer's Station Blueprints |
If broken :
If NOT broken:
|
Air Alarm | File:AirAlarm.png |
|
|
|
Fire Alarm | File:FireAlarm.png |
|
|
|
Airlock |
|
|
Note : If the door was shorted out by a cryptographic sequencer, you can skip directly to removing the broken electronics with a Crowbar | |
Computers |
|
|
| |
AI Core |
|
|
| |
Light Fixture |
|
|
| |
Security Camera |
|
Available Upgrades: Phoron for EMP Proofing, a Carrot for X-Ray Vision, and a Proximity sensor for Motion Sensor
|
| |
Turrets |
|
|
TBA | |
Solar Panels and Trackers | ||||
Mass Driver |
|
|
| |
Disposal Pipes |
|
|
Note : The disposal pipe can then be destroyed by using the Disposal Pipe Dispenser | |
Conveyor Switch (WRONG) | File:Conveyor switch.png |
|
|
|
Conveyor Belt (WRONG) | File:Conveyor active.gif |
To Configure: The only way to operate a Conveyor Belt is with a Conveyor Switch set to the same frequency and ID tag. A Conveyor Belt will automatically try to copy the Frequency and ID tag of any Conveyor Switches or Conveyor Belts within one tile of distance when built. It's recommendable to start by constructing the Conveyor Switch and continue the belt line from there. If a Conveyor Belt is misconfigured, use a Use a Multitool to set it's frequency and ID tag to match those of a Conveyor Switch. |
Miscellaneous
Disposal Machinery
Requires |
---|
, Welder, |
If Disposal Bin, turn off the pump Screwdriver to remove power connection Welder on machine to remove its joints Wrench to detach it from the plating
Machine
Requires |
---|
, , , |
Screwdriver to open the cover. Crowbar to pry out the circuit. Wirecutters to remove the wires. Wrench to disassemble the frame. Usually returns all or most components used in construction. Some components may become broken.
Recharge Station
Requires |
---|
, , , , |
Unlock the charger with an ID Screwdriver to open the cover. Wrench to dislodge the internal plating. Wirecutters to remove the wires. Crowbar to remove the components. Usually returns all or most components used in construction. Some components may become broken. Template:Gameplay Guides